乐动网页版·官方站在线登入_乐动(中国)

RETURN

Tailings Pond of Dahutang North Tungsten Mine, Wuning, Jiangxi

 

The dam of tailings pond is constructed by means of filling against the center line. Maximum heigh of dam: l98m.

Final effective storage: about l88,700,000m³.